• Client
  • Auckland Council

  • Completion Date
  • Project period: 2015 to present

Westgate Pond 4

Description

Engineers and ecologists worked collaboratively with the client to design an on-line wetland required for stormwater detention that minimised potential ecological impacts as much as possible. Included engineering design, stream ecological valuation (SEV) assessment, development of a stream mitigation package with Auckland Council, design of a fish ladder through a 4m high manhole riser, preparation of all application documents.

Expertise

  • Engineering

  • Stream ecological valuation

  • Fish passage design

  • Planning