What are the subdivision costs?


A scheme plan of subdivision needs to be prepared and this will enable a costing to be carried out. As normal urban services such as water and drainage are not normally necessary on a rural subdivision the physical costs are often just driveway formation and power and telecom connections. You will also need to provide mitigation for stormwater runoff whcih may need some vegetation planting. Other requirements specific top the site can be worked out easrly in the process – we can give you guidance on this. Some forms of rural subdivision, such as bonus lost through transferring titles, have greater costs. Of course for all subdivision there is the need for a subdivision consent from the Council and the costs of the actual survey and arranging for titles.